Velana International Airport – ELKOM Insulated Curtain Wall Project

The ELKOM Integrated Metal Insulated Curtain Wall System was selected for the Velana International Airport project in the Maldives. Combining architectural metal finishes, insulated panel construction, and concealed connection technology, the system provides an integrated facade solution for large-scale public buildings.

Velana International Airport in the Maldives is a featured international airport facade project supplied by Glostar. The project utilized the ELKOM Integrated Metal Insulated Curtain Wall System, incorporating PVDF-coated metal panels, integrated thermal insulation, and non-penetrating four-side connection technology. Glostar served as the main exterior wall panel supplier for this project.


Project Overview: Velana International Airport, Maldives

Located in the Maldives, Velana International Airport is a major international aviation gateway serving travelers arriving in the island nation.

The airport project required an exterior wall solution that could combine architectural appearance, thermal insulation, fire performance, and reliable panel connections.

As the main supplier of exterior wall panels for the project, Glostar supplied the ELKOM Integrated Metal Insulated Curtain Wall System, supporting the architectural facade application with an integrated insulated metal panel solution.

Artigo Detalhes
Project Name Aeroporto Internacional de Velana
Location Malé, Maldives
Building Type International Airport
Produto ELKOM Integrated Metal Insulated Curtain Wall System
Candidatura Exterior Wall / Architectural Facade
Supplier Role Main Exterior Wall Panel Supplier
Surface Finish PVDF Coating
Comportamento em caso de incêndio Class A, subject to product certification and applicable test standard
Connection Non-Penetrating Four-Side Tongue-and-Groove Thermal-Break Connection

Aeroporto Internacional de Velana

ELKOM Integrated Metal Insulated Curtain Wall System

O ELKOM Integrated Metal Insulated Curtain Wall System combines exterior metal cladding and thermal insulation within a coordinated facade panel assembly.

Unlike conventional multi-layer wall construction, the integrated system brings the exterior metal finish and insulation layer together in a prefabricated panel solution.

For the Velana International Airport project, the system incorporated a PVDF-coated metal surface and a non-penetrating four-side tongue-and-groove connection with a thermal-break design.

These features support architectural facade continuity while addressing insulation, connection detailing, and long-term exterior wall performance.

product highlights:

  • Integrated Construction: Metal cladding and insulation within a coordinated panel assembly.
  • PVDF Surface Finish:Exterior coating selected for architectural appearance and weather resistance.
  • Concealed Connection:Non-penetrating joint design with a clean exterior appearance.
  • Thermal-Break Detailing:Connection design intended to reduce heat transfer through panel joints.

ELKOM System Applied

Key Features of the ELKOM Curtain Wall System

1. Class A Fire Performance

Fire safety is a key consideration in airport terminal and public building facade design. The ELKOM system incorporates insulated panel construction, with fire-performance specifications determined by the selected panel configuration and applicable project requirements.

 

Relevant fire test reports and technical documentation can be provided for project evaluation.

2. PVDF-Coated Metal Surface

The PVDF-coated exterior metal surface provides a durable architectural finish designed to resist weather exposure, color degradation, and surface deterioration.

This makes the finish suitable for facade projects where appearance and long-term maintenance are important considerations.

3. Non-Penetrating Four-Side Connection

The ELKOM system features a non-penetrating four-side tongue-and-groove connection design.

The connection arrangement helps maintain a clean facade appearance without exposed through-panel fasteners on the exterior surface.

4. Integrated Thermal Insulation

The insulated panel construction combines the exterior metal facing and insulation layer within one integrated assembly.

Together with thermal-break joint detailing, the system is designed to support thermal performance and reduce unwanted heat transfer.

5. Prefabricated Panel Installation

The integrated panel configuration reduces the number of separate facade layers that need to be assembled on site.

With appropriate installation planning and project-specific connection details, prefabricated panels can simplify construction sequencing.

ELKOM Curtain Wall System

Meeting the Facade Requirements of an International Airport

Airport terminal buildings require exterior wall systems that balance architectural appearance, thermal performance, fire safety, and construction efficiency.

For the Velana International Airport project, the ELKOM system offered a coordinated facade solution through its insulated metal panel construction and concealed connection design.

Architectural Appearance

The PVDF-coated metal exterior and concealed panel joints support a consistent facade finish suitable for large public buildings.

Isolamento térmico

The integrated insulation layer and thermal-break connection design address heat transfer through the wall assembly and panel joints.

Segurança contra incêndios

The specified Class A fire-performance characteristics formed part of the system’s suitability for the project, subject to the applicable certification and building requirements.

Construction Coordination

Prefabricated panels and engineered connection details provide a structured approach to facade installation and coordination.

Project Outcome

As the main exterior wall panel supplier for the Velana International Airport project, Glostar supplied the ELKOM Integrated Metal Insulated Curtain Wall System for the airport’s architectural facade application.

 

The project demonstrates the use of integrated insulated metal facade panels in a major international transportation facility, highlighting the system’s concealed connection design, PVDF-coated finish, and integrated insulation construction.

Velana International Airport Project Gallery

Explore the application of the ELKOM Integrated Metal Insulated Curtain Wall System at Velana International Airport in the Maldives, including the architectural facade, exterior metal panel finishes, and integrated curtain wall design.

Architectural Applications of the ELKOM System

The ELKOM Integrated Metal Insulated Curtain Wall System is designed for building projects requiring a combination of exterior architectural finishes, insulation, and engineered panel connections.

Potential applications include:

  • Airport Terminals and Transportation Hubs
  • Commercial and Office Buildings
  • Exhibition and Convention Centers
  • Public and Institutional Buildings
  • Large Industrial and Technology Facilities

For each application, panel specifications, structural support, fire performance, and joint detailing should be evaluated against project requirements.

Planning a Similar Architectural Facade Project?

Looking for an integrated insulated metal curtain wall solution for your airport, commercial building, or large-scale construction project?

Glostar provides architectural facade system solutions, product customization, technical consultation, and installation guidance.

Share your project drawings, building location, approximate facade area, and performance requirements with our team.

Formulário do rodapé da página inicial
Ir para o topo da página

Obtenha um orçamento imediato

Contact Form

Schedule a Meeting​

Meet Glostar at the Big 5 Global 2026, November 23–26, Booth SS1 A156-3.

Descarregar formulário
YOU ARE INVITED
Big 5 Global
2026
MEET US AT
Booth No. SS1 A156-3

INTEGRATED BUILDING MATERIALS SOLUTIONS

MEET GLOSTAR

Meet Glostar at Big 5 Global 2026 in Dubai

Explore steel structure buildings, metal roofing and wall systems, high-end curtain wall systems, and cleanroom solutions.

Meet our team in Dubai to discuss your upcoming industrial and commercial projects.

WHEN

23 a 26 de novembro de 2026

WHERE

Dubai World Trade Centre, UAE
BOOTH
SS1 A156-3

Let’s discuss your next building project.

Este conteúdo está bloqueado porque estabeleceria uma ligação ao YouTube.

Obtenha um orçamento imediato

Contact Form